Dar Bouidar Solar – 5 – the long wait

Finishing the construction work and completing this project has been waiting for almost a year now. I left Dar Bouidar on 11th of March 2020 and little was I aware back then that the corona virus would change so many things. All construction work was scheduled to be finished in April or May of 2020 and power from the diesel generator to be replaced by clean and free solar energy. But obviously that was not what happened.

However, now in February 2021 the project is about to re-awake. We are preparing the shipping and customs paperwork for the solar panels and all the other components to be shipped out to Morocco. The new revised schedule points to early April 2021 for construction work to resume. And hopefully we will have switched Dar Bouidar to solar before the end of April.

I’ll keep you posted.